The adoption of text changes (TC-2-17) Transit Facilities and (TC-4-17) Green Stormwater Infrastructure/Low Impact Development led to a comprehensive update of the standard detail drawings. The updates are now available at raleighnc.gov/dsguide under Tools and Services (see the right-hand column).
New and Updated Details:
- Bike Facilities
- Green Stormwater Infrastructure
- Stormwater
- Transit
- Transportation
- Tree Protection and Planting
Plans will be accepted with both the revised and old standard details until January 1, 2019, following which all plans must utilize the revised details. The City encourages designers to begin using the revised standard details as soon as possible.